Composite Walkway for use in Nuclear Power Stations

Weir Strachan and Henshaw Ltd - Nuclear Services Division


As part of a new crane system required for the handling of fuel packages, there is a need for lightweight, easy to handle and very robust walkways to be used as part of the maintenance installation. The walkways are fitted with 2 sets of wheels to allow them to either move on the crane tracks or on floors. The walkways are fully demountable for stowage in small spaces.


ACL input

Design and full specification of the walkways, including manufacturing drawings.

Provision of submission calculations for third party acceptance.

Manufacture and supply of the complete walkways.

Completion of structural testing.

Provision of installation and maintenance manuals.